Engineering

We help to implement any construction projects. Our specialists offer the most optimal solutions that help to carry out work taking into account all the requirements of occupational safety, design standards and individual characteristics of the production site. The proposed solutions increase the comfort and convenience of work, which increases the speed and quality of project implementation.

Construction site audit

It is necessary to collect the initial data directly at the work site

It allows us to provide an accurate bid cost to the customer

It allows all technical questions to be answered

Audit scheme

01

Preliminary

agreement

on the audit

02

Discussion of requirements

for construction

site visits

03

Agreement of the area

where the set of works

should be carried out

04

Assessment of existing equipment

and items interfering

with the works

05

Evaluation of combined works

Preparation of engineering and technical documentation

Engineering and technical documentation is developed by specialists with appropriate qualifications and work experience based on the requirements of regulatory and technical documentation, instructions for assembly and operation of the manufacturer. Drawings of structures/technological equipment or the results obtained during the audit can be presented as initial data.

Documentation development is carried out to solve a number of issues: visualization of the adopted technical solution, its coordination with the customer, transfer of the design to work, planning of work, drawing up specifications of material requirements, accurate calculation of the volume of work for further formation of a commercial proposal by specialists of the relevant department.

Project development after the audit

During the technical audit and the meeting with the customer, the details of the future project, the need and order of work in certain places are discussed, as well as the factors that may complicate the design development become clear.

These details may not be specified in the project documentation or in the terms of reference from the customer, but only through an audit can the factors be identified.

The audit makes it possible to understand not only the specifics of the planned work, but also to build an accurate schedule of work, allows you to specify details that will affect the technical solution, the order and timing of installation and the cost of the service as a whole.

Development of technical solutions

Faced with the need to ensure safe access to heights, our engineers begin to develop various technical solutions that meet all the Customer's wishes in terms of ease of working with scaffolding structures, ensuring safe working conditions from scaffolding, and meeting the requirements of strength and stability. Based on the initial data obtained on the basis of the terms of reference or based on the audit results, a 3-D model of the future construction of scaffolding is created, then the volume of the developed structure is calculated to assess the economic component. After the technical solution has been developed, a specification of the elements from which this model is to be assembled is compiled, which is then transferred to the complete set.

Development of a project for the production of works, a plan for the production of works at height and technological maps

A work production project is an organizational and technological document that is being developed to ensure a safe, technologically and economically efficient way of performing work. The work production project is developed and agreed upon in advance before the start of work. It reflects the requirements in the field of labor protection, industrial safety, the order and methods of work on the installation of scaffolding structures, personnel placement, loading and unloading operations and other safety requirements. The plan for the production of work at altitude is an organizational and technological documentation that is developed for the organization and conduct of work at altitude in accordance with the requirements of the Legislation of the Russian Federation.

Completed projects

Completed projects

Contact us