Arctic LNG 2
The project is being implemented by NOVATEK on the Gydan Peninsula. Its key feature is the use of unique gravity-based structures (GBS) capable of producing LNG directly on the water.
отработано человеко-часов
1 043 000
Отработано человеко-часов
1 043 000Количество сотрудников
437At this facility, POLATI is involved in several areas of work:
- Erection and dismantling of scaffolding — to provide access to process equipment and pipelines;
- Execution of thermal insulation works — considering energy efficiency and equipment weather protection requirements;
- Fitting and auxiliary works as part of an integrated team in specific areas.
This is the world's first such project adapted for operation in the Extreme North.
Arctic LNG 2
The project is being implemented by NOVATEK on the Gydan Peninsula. Its key feature is the use of unique gravity-based structures (GBS) capable of producing LNG directly on the water.
отработано человеко-часов
1 043 000
Отработано человеко-часов
1 043 000Количество сотрудников
437At this facility, POLATI is involved in several areas of work:
- Erection and dismantling of scaffolding — to provide access to process equipment and pipelines;
- Execution of thermal insulation works — considering energy efficiency and equipment weather protection requirements;
- Fitting and auxiliary works as part of an integrated team in specific areas.
This is the world's first such project adapted for operation in the Extreme North.