The Syktyvkar Timber Industry Complex
отработано человеко-часов
Отработано человеко-часов
39 480Количество сотрудников
55Собрано лесов, м³
7 676At this facility, POLATI carried out works inside the boiler, under conditions of limited access and increased complexity. Scaffolding installation was carried out in a confined space, with materials fed through a technological manhole only 50 cm in diameter.
Throughout the work, the company's engineers were constantly present on site, ensuring precise coordination, monitoring compliance with safety requirements, and quick decision-making.
The Syktyvkar Timber Industry Complex
Volume of completed works, m³
Number of employees
73Number of engineers and technicians
5At this facility, POLATI carried out works inside the boiler, under conditions of limited access and increased complexity. Scaffolding installation was carried out in a confined space, with materials fed through a technological manhole only 50 cm in diameter.
Throughout the work, the company's engineers were constantly present on site, ensuring precise coordination, monitoring compliance with safety requirements, and quick decision-making.