Radisson Collection Hotel

Construction of the Radisson Collection Hotel, Moscow, began in 1953, and by 1957 the hotel welcomed its first guests. In 2025, restoration work began on its spire forming a unique architectural feature of the building. The scaffolding installation for the restoration was entrusted to POLATI, with scaffolding systems supplied by partner company SOYUZ.

The work was carried out at heights exceeding 100 meters: the main structures were installed at an elevation of 116 meters with the use of runways that created the effect of "floating" scaffolding. The maximum working height reached 160 meters. The project involved significant engineering challenges: a complicated design, limited storage space on site, and work at great height.

 

The operations required a highly trained workforce, accuracy, and strict compliance with safety regulations. The structural design team prepared high-precision engineering calculations to ensure the complete reliability and safety of the structures. This project became a striking example of top-tier engineering expertise and the professionalism of the assembly team, combining technical complexity with the historical significance of the landmark.

Radisson Collection Hotel

Construction of the Radisson Collection Hotel, Moscow, began in 1953, and by 1957 the hotel welcomed its first guests. In 2025, restoration work began on its spire forming a unique architectural feature of the building. The scaffolding installation for the restoration was entrusted to POLATI, with scaffolding systems supplied by partner company SOYUZ.

Area of assembled scaffolding, m²

3 400

Number of employees

15

Number of engineers and technicians

1

The work was carried out at heights exceeding 100 meters: the main structures were installed at an elevation of 116 meters with the use of runways that created the effect of "floating" scaffolding. The maximum working height reached 160 meters. The project involved significant engineering challenges: a complicated design, limited storage space on site, and work at great height.

 

The operations required a highly trained workforce, accuracy, and strict compliance with safety regulations. The structural design team prepared high-precision engineering calculations to ensure the complete reliability and safety of the structures. This project became a striking example of top-tier engineering expertise and the professionalism of the assembly team, combining technical complexity with the historical significance of the landmark.

Other projects of the POLATI company

Other projects of the POLATI company

Contact us

By clicking the "Submit" button, I knowingly provide POLATI LLC with my consent to the processing of my personal data and confirm that

I have read and agree to the Personal Data Processing Policy and the User Agreement.