Zapsibneftekhim
POLATI is engaged at the facility both within scheduled maintenance and servicing operations and in the construction of the new DGP-2 unit, which requires involvement at all stages — from the groundwork phase to the facility’s commissioning.
Scaffolding installation and dismantling are performed under extremely low temperatures — averaging down to -35°C — which imposes special requirements on safety, material selection, and work organization. Part of the work is conducted in confined spaces and at height, with constant monitoring by technical supervision.
Zapsibneftekhim
Volume of completed works, m³
Number of employees
147Number of engineers and technicians
18POLATI is engaged at the facility both within scheduled maintenance and servicing operations and in the construction of the new DGP-2 unit, which requires involvement at all stages — from the groundwork phase to the facility’s commissioning.
Scaffolding installation and dismantling are performed under extremely low temperatures — averaging down to -35°C — which imposes special requirements on safety, material selection, and work organization. Part of the work is conducted in confined spaces and at height, with constant monitoring by technical supervision.