Отработано человеко-часов

393 000

Количество рабочих

167

Количество специалистов ИТР-состава

23

Объем выполненных работ

348 000

Employees of POLATI are engaged at this facility to carry out the installation of scaffolding on technological overpasses. The work is carried out under conditions of increased complexity: extensive routes, numerous pipeline intersections, limited space, and work at height. Each scaffolding installation solution is designed individually, considering the specific site's features and the requirements of related subcontractors.

The complex is equipped with high-tech equipment that efficiently removes hydrogen sulfide, carbon dioxide, moisture, and other impurities, ensuring the gas meets strict environmental and technical standards.

The Gas Processing Complex in Ust-Luga is a state-of-the-art industrial facility designed for the purification and preparation of natural gas for transportation and subsequent use.

Man-hours of work

393 000

Number of employees

167

Number of engineers and technicians

23

Volume of completed works, m³

348 000

Employees of POLATI are engaged at this facility to carry out the installation of scaffolding on technological overpasses. The work is carried out under conditions of increased complexity: extensive routes, numerous pipeline intersections, limited space, and work at height. Each scaffolding installation solution is designed individually, considering the specific site's features and the requirements of related subcontractors.

The complex is equipped with high-tech equipment that efficiently removes hydrogen sulfide, carbon dioxide, moisture, and other impurities, ensuring the gas meets strict environmental and technical standards.