Отработано человеко-часов
Количество рабочих
167Количество специалистов ИТР-состава
23Объем выполненных работ
348 000Employees of POLATI are engaged at this facility to carry out the installation of scaffolding on technological overpasses. The work is carried out under conditions of increased complexity: extensive routes, numerous pipeline intersections, limited space, and work at height. Each scaffolding installation solution is designed individually, considering the specific site's features and the requirements of related subcontractors.
The complex is equipped with high-tech equipment that efficiently removes hydrogen sulfide, carbon dioxide, moisture, and other impurities, ensuring the gas meets strict environmental and technical standards.
Man-hours of work
Number of employees
167Number of engineers and technicians
23Volume of completed works, m³
348 000Employees of POLATI are engaged at this facility to carry out the installation of scaffolding on technological overpasses. The work is carried out under conditions of increased complexity: extensive routes, numerous pipeline intersections, limited space, and work at height. Each scaffolding installation solution is designed individually, considering the specific site's features and the requirements of related subcontractors.
The complex is equipped with high-tech equipment that efficiently removes hydrogen sulfide, carbon dioxide, moisture, and other impurities, ensuring the gas meets strict environmental and technical standards.