Udokan mining and processing plant
отработано человеко-часов
Отработано человеко-часов
1 621 440Количество сотрудников
220At this facility, POLATI specialists carry out the erection and dismantling of façade scaffolding, ensuring safe access to all work areas, including hard-to-reach sections. In parallel, high-altitude work is being carried out with the involvement of industrial climbers, including the application of anti-corrosion protection to metal structures.
Standard fasteners in sandwich panels are also being replaced with seismic-resistant bolts.
Weather conditions here are equated to northern conditions for a reason; winter temperatures reach abnormally low levels, combined with strong winds and low atmospheric pressure.
Udokan mining and processing plant
Volume of completed works, m³
Number of employees
306Number of engineers and technicians
30At this facility, POLATI specialists carry out the erection and dismantling of façade scaffolding, ensuring safe access to all work areas, including hard-to-reach sections. In parallel, high-altitude work is being carried out with the involvement of industrial climbers, including the application of anti-corrosion protection to metal structures.
Standard fasteners in sandwich panels are also being replaced with seismic-resistant bolts.
Weather conditions here are equated to northern conditions for a reason; winter temperatures reach abnormally low levels, combined with strong winds and low atmospheric pressure.