отработано человеко-часов
Отработано человеко-часов
1 043 000Количество сотрудников
437At this facility, POLATI is involved in several areas of work:
— Erection and dismantling of scaffolding — to provide access to process equipment and pipelines;
— Execution of thermal insulation works — considering energy efficiency and equipment weather protection requirements;
— Fitting and auxiliary works as part of an integrated team in specific areas.
style="language: ru; line-height: 130%; margin-top: 0pt; margin-bottom: 7. 0pt; margin-left: 0in; text-align: justify; text-justify: inter-ideograph; direction: ltr; unicode-bidi: embed; mso-line-break-override: none; word-break: normal; punctuation-wrap: hanging;">The project is being implemented by NOVATEK on the Gydan Peninsula. Its key feature is the use of unique gravity-based structures (GBS) capable of producing LNG directly on the water. This is the world's first such project adapted for operation in the Extreme North.
Man-hours of work
Number of employees
149Number of engineers and technicians
17Volume of completed works, m³
1 700 000At this facility, POLATI is involved in several areas of work:
— Erection and dismantling of scaffolding — to provide access to process equipment and pipelines;
— Execution of thermal insulation works — considering energy efficiency and equipment weather protection requirements;
— Fitting and auxiliary works as part of an integrated team in specific areas.
style="language: ru; line-height: 130%; margin-top: 0pt; margin-bottom: 7. 0pt; margin-left: 0in; text-align: justify; text-justify: inter-ideograph; direction: ltr; unicode-bidi: embed; mso-line-break-override: none; word-break: normal; punctuation-wrap: hanging;">The project is being implemented by NOVATEK on the Gydan Peninsula. Its key feature is the use of unique gravity-based structures (GBS) capable of producing LNG directly on the water. This is the world's first such project adapted for operation in the Extreme North.