отработано человеко-часов
5 618 241
Отработано человеко-часов
5 618 241Количество сотрудников
1 000POLATI joined the project at an early stage — launching key areas of work entirely from scratch:
- Organization and initiation of insulation works (including high-altitude operations);
- Installation of sandwich panels and structural frameworks;
- Concrete works across various sections of the site;
- Erection and dismantling of scaffolding around the entire perimeter of the facility.
One of the key areas of focus was the large-scale involvement of our industrial climbers in high-altitude operations.
The Amur Gas Processing Plant (AGPP) is one of the largest natural gas processing facilities in the world, implemented by Gazprom PJSC as part of the Power of Siberia gas project. The project is distinguished by its immense scale and a high degree of technological complexity.
Man-hours of work
8 500 000
Number of employees
667Number of engineers and technicians
70Volume of completed works, m³
19 000 000POLATI joined the project at an early stage — launching key areas of work entirely from scratch:
- Organization and initiation of insulation works (including high-altitude operations);
- Installation of sandwich panels and structural frameworks;
- Concrete works across various sections of the site;
- Erection and dismantling of scaffolding around the entire perimeter of the facility.
One of the key areas of focus was the large-scale involvement of our industrial climbers in high-altitude operations.