Number of employees

20

Man-hours worked

27 440

Installation volume, m²

3 520

man-hours worked

27 440

The Udokan copper deposit is unique in terms of reserves. It is being prepared for

exploitation by open pit and underground methods. Copper resources amount to over

26 million tons, and proven copper reserves are 15.1 million tons. The average grade

of metal in ore is 1.05%. Besides copper, the ores of the deposit contain silver, gold and iron.

The weather conditions here are equated to the northern ones for a reason, the temperature in winter reaches

abnormally low temperatures in winter, and this is with strong winds and low atmospheric pressure.

On this site POLATI performs installation and dismantling of facade scaffolding, installation and dismantling of stationary scaffolding for further works. The works are complicated by weather conditions, but despite this all works are performed qualitatively and on time.

Other projects of the POLATI company

Other projects of the POLATI company

Contact us