Nevinnomysskaya SDPP
One of the largest thermal power plants in the North Caucasus, located in Nevinnomyssk, Stavropol Krai
Number of employees
20Man-hours worked
27 440Installation volume, m²
3 520man-hours worked
Installed electric capacity of the GRES is 1551.4 MW, heat capacity is 585 Gcal/h.
The power plant is designed to supply electric power to the unified energy system of the North Caucasus and to supply industrial consumers and population.
power system of the North Caucasus and supply industrial consumers and the population with hot water and steam.
of the city with hot water and steam.

POLATI is installing Layher modular wedge scaffolding at this site. The structures are installed outside and inside the apparatuses. The company's employees also took part in reinforcing the metal structures of the perimeter fence of the security zone of the internal service security zone, as well as performed emergency work on some units. POLATI worked 114,240 man-hours, the volume of works amounted to 120,976 m³, 16 employees were involved. The works are complicated by the fact that they are carried out on operating equipment and installations. This entails risks associated with contact with heated surfaces, rotating machinery, hazardous substances and conductive parts. Risk mitigation measures are worked out before each assignment. Despite complications, all work is carried out on time and to the highest possible quality.