отработано человеко-часов

1 621 440

Отработано человеко-часов

1 621 440

Количество сотрудников

220

At this facility, POLATI specialists carry out the erection and dismantling of façade scaffolding, ensuring safe access to all work areas, including hard-to-reach sections. In parallel, high-altitude work is being carried out with the involvement of industrial climbers, including the application of anti-corrosion protection to metal structures.

 

Standard fasteners in sandwich panels are also being replaced with seismic-resistant bolts.

Weather conditions here are equated to northern conditions for a reason; winter temperatures reach abnormally low levels, combined with strong winds and low atmospheric pressure.

The Udokan copper deposit is unique in terms of its reserves. It is being prepared for open and underground mining. In addition to copper, the deposit's ores contain silver, gold, and iron.

Man-hours of work

1 300 000

Number of employees

306

Number of engineers and technicians

30

Volume of completed works, m³

4 400 000

At this facility, POLATI specialists carry out the erection and dismantling of façade scaffolding, ensuring safe access to all work areas, including hard-to-reach sections. In parallel, high-altitude work is being carried out with the involvement of industrial climbers, including the application of anti-corrosion protection to metal structures.

 

Standard fasteners in sandwich panels are also being replaced with seismic-resistant bolts.

Weather conditions here are equated to northern conditions for a reason; winter temperatures reach abnormally low levels, combined with strong winds and low atmospheric pressure.