отработано человеко-часов
Отработано человеко-часов
39 480Количество сотрудников
55Собрано лесов, м³
7 676At this facility, POLATI carried out works inside the boiler, under conditions of limited access and increased complexity. Scaffolding installation was carried out in a confined space, with materials fed through a technological manhole only 50 cm in diameter.
Throughout the work, the company's engineers were constantly present on site, ensuring precise coordination, monitoring compliance with safety requirements, and quick decision-making.
Man-hours of work
Number of employees
73Number of engineers and technicians
5Volume of completed works, m³
13 100At this facility, POLATI carried out works inside the boiler, under conditions of limited access and increased complexity. Scaffolding installation was carried out in a confined space, with materials fed through a technological manhole only 50 cm in diameter.
Throughout the work, the company's engineers were constantly present on site, ensuring precise coordination, monitoring compliance with safety requirements, and quick decision-making.