Человеко-часов
Отработано человеко-часов
86 200Объем выполненных работ
167 899 м³At this facility, POLATI performs scaffolding installation works, providing access to equipment in blast furnaces, foundry departments, and other critical areas. Work is carried out under conditions of high temperature, gas contamination, and confined spaces, with constant changes in task fronts. Due to the plant's technological specifics and unpredictable schedule, the enhanced involvement of engineering staff plays a key role: PTO and engineering staff accompany all stages — from design to implementation, including in a 24/7 format.
The plant's production capacities include blast furnaces and steelmaking units, rolling mills, and foundries with a round-the-clock cycle.
Man-hours of work
Number of employees
136Number of engineers and technicians
25Volume of completed works, m³
2 500 000At this facility, POLATI performs scaffolding installation works, providing access to equipment in blast furnaces, foundry departments, and other critical areas. Work is carried out under conditions of high temperature, gas contamination, and confined spaces, with constant changes in task fronts. Due to the plant's technological specifics and unpredictable schedule, the enhanced involvement of engineering staff plays a key role: PTO and engineering staff accompany all stages — from design to implementation, including in a 24/7 format.
The plant's production capacities include blast furnaces and steelmaking units, rolling mills, and foundries with a round-the-clock cycle.