отработано человеко-часов
Количество сотрудников
16Количество собранных лесов, м²
120 976Отработано человеко-часов
114 240POLATI is installing Layher modular wedge lock scaffolding at this facility. The structures are installed outside and inside the machinery. The company's employees also participated in reinforcing the metal structures of the perimeter fence around the internal security zone and performed emergency repairs on some units.
The work is complicated by the fact that it must be carried out on operating equipment and installations. Before each task, risk mitigation measures are developed.
Man-hours of work
Number of employees
13Number of engineers and technicians
5Volume of completed works, m³
415 000POLATI is installing Layher modular wedge lock scaffolding at this facility. The structures are installed outside and inside the machinery. The company's employees also participated in reinforcing the metal structures of the perimeter fence around the internal security zone and performed emergency repairs on some units.
The work is complicated by the fact that it must be carried out on operating equipment and installations. Before each task, risk mitigation measures are developed.