774 674At this facility, POLATI is installing structures of the Layher modular wedge system. Scaffolding installation at the facility is complicated by the immediate proximity to high-temperature equipment, high-pressure pipelines, elevated noise levels, and general spatial constraints.
The power plant has an installed electrical capacity of 2,520 MW and a thermal capacity of 120 Gcal/hour. Natural gas is the main fuel, and fuel oil is the reserve fuel. The power plant has eight power units, each with a capacity ranging from 300 to 325 MW.
Man-hours of work
Number of employees
12Number of engineers and technicians
3Volume of completed works, m³
505 000At this facility, POLATI is installing structures of the Layher modular wedge system. Scaffolding installation at the facility is complicated by the immediate proximity to high-temperature equipment, high-pressure pipelines, elevated noise levels, and general spatial constraints.
The power plant has an installed electrical capacity of 2,520 MW and a thermal capacity of 120 Gcal/hour. Natural gas is the main fuel, and fuel oil is the reserve fuel. The power plant has eight power units, each with a capacity ranging from 300 to 325 MW.