отработано человеко-часов

117 600

Отработано человеко-часов

117 600

Количество сотрудников

12

Объём работы, м³

774 674

At this facility, POLATI is installing structures of the Layher modular wedge system. Scaffolding installation at the facility is complicated by the immediate proximity to high-temperature equipment, high-pressure pipelines, elevated noise levels, and general spatial constraints.

The power plant has an installed electrical capacity of 2,520 MW and a thermal capacity of 120 Gcal/hour. Natural gas is the main fuel, and fuel oil is the reserve fuel. The power plant has eight power units, each with a capacity ranging from 300 to 325 MW.

Located on the banks of the Volga River in Konakovo in the Tver Oblast, Konakovskaya GRES is one of the largest local suppliers of electricity and heat.

Man-hours of work

82 000

Number of employees

12

Number of engineers and technicians

3

Volume of completed works, m³

505 000

At this facility, POLATI is installing structures of the Layher modular wedge system. Scaffolding installation at the facility is complicated by the immediate proximity to high-temperature equipment, high-pressure pipelines, elevated noise levels, and general spatial constraints.

The power plant has an installed electrical capacity of 2,520 MW and a thermal capacity of 120 Gcal/hour. Natural gas is the main fuel, and fuel oil is the reserve fuel. The power plant has eight power units, each with a capacity ranging from 300 to 325 MW.