отработано человеко-часов
Количество сотрудников
302Отработано человеко-часов
448 840Объем выполненных работ, м³
35 164At this facility, POLATI carried out the following works: installation of scaffolding to access equipment and pipelines, removal of existing insulation followed by cleaning of pipelines and process units, and installation of new thermal insulation coverings. Work was carried out in complex areas, including high-altitude zones and hard-to-reach volumes. The process was organized with the participation of a large number of specialists simultaneously engaged at different stages.
High requirements for safety, environmental standards, and equipment reliability impose special demands on contractors involved in maintenance and production preparation.
Man-hours of work
Number of employees
382Number of engineers and technicians
31Volume of completed works, m³
1 600 000At this facility, POLATI carried out the following works: installation of scaffolding to access equipment and pipelines, removal of existing insulation followed by cleaning of pipelines and process units, and installation of new thermal insulation coverings. Work was carried out in complex areas, including high-altitude zones and hard-to-reach volumes. The process was organized with the participation of a large number of specialists simultaneously engaged at different stages.
High requirements for safety, environmental standards, and equipment reliability impose special demands on contractors involved in maintenance and production preparation.