отработано человеко-часов
Отработано человеко-часов
66 640Объем работы
34 030 м³Количество сотрудников
56At this facility, POLATI personnel delivered a full cycle of scaffolding erection and dismantling works. Work was performed on operating technological units as part of planned repair campaigns.
The enterprise operates on a continuous cycle, and all repair and maintenance work is critical for preventing downtime.
Man-hours of work
Number of employees
68Number of engineers and technicians
13Volume of completed works, m³
103 000At this facility, POLATI personnel delivered a full cycle of scaffolding erection and dismantling works. Work was performed on operating technological units as part of planned repair campaigns.
The enterprise operates on a continuous cycle, and all repair and maintenance work is critical for preventing downtime.