POLATI is engaged at the facility both within scheduled maintenance and servicing operations and in the construction of the new DGP-2 unit, which requires involvement at all stages — from the groundwork phase to the facility’s commissioning.
Scaffolding installation and dismantling are performed under extremely low temperatures — averaging down to -35°C — which imposes special requirements on safety, material selection, and work organization. Part of the work is conducted in confined spaces and at height, with constant monitoring by technical supervision.
Man-hours of work
Number of employees
147Number of engineers and technicians
18Volume of completed works, m³
55 100POLATI is engaged at the facility both within scheduled maintenance and servicing operations and in the construction of the new DGP-2 unit, which requires involvement at all stages — from the groundwork phase to the facility’s commissioning.
Scaffolding installation and dismantling are performed under extremely low temperatures — averaging down to -35°C — which imposes special requirements on safety, material selection, and work organization. Part of the work is conducted in confined spaces and at height, with constant monitoring by technical supervision.