отработано человеко-часов
Количество человеко-часов
31 360Количество сотрудников
12POLATI carried out scaffolding installation works at the sludge dumps, providing access to areas requiring repair, reinforcement, or inspection.
Work on such sites is associated with unstable and complex ground, lack of standard support surfaces, and increased safety requirements.
Man-hours of work
Number of employees
27Number of engineers and technicians
3Volume of completed works, m³
50 600POLATI carried out scaffolding installation works at the sludge dumps, providing access to areas requiring repair, reinforcement, or inspection.
Work on such sites is associated with unstable and complex ground, lack of standard support surfaces, and increased safety requirements.